News Flash Home
The original item was published from 6/7/2023 2:11:49 PM to 6/8/2025 12:00:01 AM.

News Flash

Word on the Street

Posted on: June 7, 2023

[ARCHIVED] June 2023

Project map for Kearney-Peachtree areaKEARNEY STREET (Belt Line Road to SH 352) and PEACHTREE ROAD (Skyline Drive to Peachtree Road)
What: 
Concrete pavement reconstruction of identified areas including isolated curb, median, and sidewalk repairs.
When: Project is scheduled to bid in June and construction should start in late summer.

Plans for Lucas BlvdF. P. LUCAS BLVD. – McKenzie Road to E. Cartwright Road
What:
Existing two-lane asphalt road will be replaced with a four-lane divided concrete thoroughfare. The project includes trails and a new bridge section. Two-way traffic will be maintained on existing or new pavement during construction.
When: Project has been bid. Construction will start in this summer after utility relocations.

Plans for South Pkwy SOUTH PARKWAY – U.S. 80 to Peachtree Road (Real. Texas. Roads. project*)
What: Utility and paving reconstruction of a two-lane residential collector street to include areas of on-street parking. Sections of the road will be closed during different phases of construction. Residents will have alley access to their homes.
When: Project is currently under design with 60% of review comments returned. Scheduled to bid in late 2023.


Construction on Skyline DriveSKYLINE DRIVE – Town East Boulevard to Peachtree Road
What: Reconstruction of the entire four-lane thoroughfare. Traffic has been directed to the westbound lanes which will allow all four of the new lanes to be constructed. The new roadway will create a buffer area with the existing residential homes that includes a trail, screening wall, and landscaping.
When: Pavement removal and utility construction are underway. Construction scheduled to be completed in the summer of 2024.


Updated construction on Eastridge Park as of May 2023EASTRIDGE PARK (Real. Texas. Roads. project*)
What: Residential water and street improvements in various areas in and around Eastridge Park neighborhood. Sections of concrete pavement have been identified for removal and replacement along with some sidewalks and alley approaches. Construction is substantially complete on Borman Avenue, Lovell Drive, Anders Drive, Schirra Way, and Stafford Lane.
Where: Streets in the Eastridge Park project include Belhaven Drive, Cumberland Drive, Eastbrook Drive, Greenhill Drive, Larchmont Drive, Mark Drive, Moreland Drive, Whit Drive, Lovell Drive, Stafford Lane, Schirra Way, Anders Drive, Borman, Avenue, Fulton Drive, John Glenn Parkway, Viva Drive, Catalina Drive, and Flamingo Way.
When: Utilities and paving are starting on Fulton Drive and Belhaven Drive. The project should be complete by the end of 2023.

Rollingwood Hills neighborhoodROLLINGWOOD HILLS (Real. Texas. Roads. project)

What: Residential water, sanitary sewer, and street improvements in the Rollingwood Hills subdivision. Paving improvements will include both concrete reconstruction and asphalt milling and overlay. Various sidewalks, driveway approaches and alleys will also be replaced.

Where: Streets include Ridgefield Circle, Darien Drive, Rollingwood Drive, Orange Lane, Brunswick Lane, Fielding Drive, Woodbridge Way, Hamden Lane, Glenridge Drive, Danbury Drive, Derby Drive, Military Parkway (water only), and Scyene Road (water only).

When: Residential water, sanitary sewer, and street improvements in the Rollingwood Hills subdivision. Paving improvements will include both concrete reconstruction and asphalt milling and overlay. Various sidewalks, driveway approaches and alleys will also be replaced.



For information and an interactive map on all current and future City of Mesquite transportation projects, visit www.cityofmesquite.com/PublicWorksProjects.

*Real. Texas. Roads. is the program name for the road repairs funded by the $125 million bond sale approved by voters in November 2015. Repairs under this program are limited to residential, two-lane roadways. Learn more about Real. Texas. Roads.

The Texas Department of Transportation (TxDOT) manages reconstruction and repair for IH-635, IH-30, IH-20, U.S. 80, and the work on Lawson Road under the Highway Safety Improvement Program grant. For TxDOT updates, visit www.drivetexas.org.


Facebook Twitter Email

Other News in Word on the Street

September 2025

Posted on: September 3, 2025

August 2025

Posted on: August 6, 2025 | Last Modified on: August 6, 2025

July 2025

Posted on: July 2, 2025 | Last Modified on: June 27, 2025

June 2025

Posted on: June 4, 2025

May 2025

Posted on: May 7, 2025

April 2025

Posted on: April 2, 2025 | Last Modified on: April 2, 2025

March 2025

Posted on: March 5, 2025 | Last Modified on: March 18, 2025

February 2025

Posted on: February 5, 2025

January 2025

Posted on: January 1, 2025

December 2024

Posted on: December 4, 2024

November 2024

Posted on: November 6, 2024

F. P. Lucas Blvd. closure, Oct. 16-18

Posted on: October 11, 2024

October 2024

Posted on: October 2, 2024
FP Lucas Rd Closure Sept 17-18

F. P. Lucas Blvd. closure, Sept. 17-18

Posted on: September 13, 2024

September 2024

Posted on: September 4, 2024 | Last Modified on: September 13, 2024

August 2024

Posted on: August 7, 2024
City of Mesquite and Dallas County officials celebrate the Skyline Drive project completion

Skyline Drive reconstruction complete

Posted on: July 30, 2024 | Last Modified on: August 29, 2024

Skyline Drive lanes opening up

Posted on: July 11, 2024

July 2024

Posted on: July 3, 2024

June 2024

Posted on: June 5, 2024

May 2024

Posted on: May 1, 2024 | Last Modified on: April 30, 2024