Mesquite, TX
Home Page
Go to Site Search

News Flash

Belt Line Road closures begin Feb. 11

Home Posted on February 08, 2019

Mesquite, Texas – February 8, 2019 – Beginning Feb. 11, bridge repair begins on the northbound lanes of Belt Line Road and Broadway Boulevard, weather permitting.

Northbound two-lane closures will occur from 8:30 a.m. to 4 p.m. with one lane open during that time. All lanes are open outside of that time. For the street pavement repair near the bridge, two-lane closures will occur from 8:30 a.m. to 4 p.m. Two lanes will be open outside of that time.

Northbound lane closures for the work will occur for a period of one month, weather permitting. Southbound lane closures will be on a different schedule.

The project is coordinated by City of Garland and contractor Joe Funk Construction. For more information, call Leo Signey, City of Garland Field Operations Coordinator, at 972-205-3621.


Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow