Big Town Tank Rehabilitation

• Scope – Rehabilitation of the 2.0 Million Gallon Big Town Elevated for interior structural repairs, interior painting and long term maintenance.
• Current Status – Final design plans are at 90%.
• Schedule – Construction is scheduled to begin in Fall of 2016.
• Project Contact – Corey Nesbit, P.E., 972-329-8535