La Prada Drive (Barnes Bridge to Motley)

 Scope – This project is for the reconstruction of La Prada Drive in conjunction with installation of a large diameter water transmission main.
 Current Status – Preliminary design plans are at 5%. Schematic street alignments are being evaluated along with other street design elements such as intersection improvements.
 Schedule – Preliminary design is scheduled to start in the Fall of 2018. As part of the preliminary design, there will be both City Council and citizen input.
 Project Contact  Corey Nesbit, P.E., 972-329-8535