Town East Blvd (Skyline to US80)

• Scope – This project will be a total reconstruction of Town East Blvd from Skyline Drive to US 80. The reconstructed road will be a six-lane divided section from US 80 to Forney Road. The remaining section from Forney to Skyline Road will be a four-lane divided arterial with two vehicle lanes in each direction separated by a median with concrete curb and gutter.
• Current Status – Design is scheduled to start Fall of 2016. This is a Joint City of Mesquite/Dallas County Project.
• Schedule – Project is scheduled to begin construction in the Fall 2017.
• Project Contact Corey Nesbit, P.E., 972-329-8535