Barnes Bridge 30" Waterline (Barnes Bridge Pump Station to La Prada Drive)

• Scope – The project is for the installation of a large diameter water transmission main and reconstruction of Barnes Bridge Road.
• Current Status – Final design plans are at 90%.
• Schedule – Final design is scheduled to be complete in Fall of 2016. Construction will begin in the Winter of 2016.
Project Contact – Corey Nesbit, P.E., 972-329-8535