Gus Thomasson Road (Karla Drive to Moon Drive/Whitson Way)

• Scope – Total reconstruction of Gus Thomasson Road from Karla Drive to Moon Drive/Whitson Way. The reconstructed road will be a four–lane divided arterial with two vehicle lanes in each direction with portions separated by a depressed/bioswale median with concrete curb and gutter. The project also includes on-street parking, pedestrian sidewalks and a cycle track. 
• Current Status – Under construction.
• Schedule – Construction is currently scheduled to be completed by the Fall of 2018.
• Project Contact – Corey Nesbit, P.E., 972-329-8535