Gus Thomasson Road (Karla Drive to Moon Drive/Whitson Way)

• Scope – The project will be a total reconstruction of Gus Thomasson from Karla Drive to Moon Drive/Whitson Way. The reconstructed road will be a four–lane divided arterial with two vehicle lanes in each direction with portions separated by a depressed/bioswale median with concrete curb and gutter. Round-abouts will be constructed at Karla Drive and Moon Drive/Whitson Way along with on-street parking, pedestrian sidewalks and a cycle track.
• Current Status – Construction contract has been approved and coordination with contractor is underway.
• Schedule – Project is on schedule to begin construction January 2017.
• Project Contact – Corey Nesbit, P.E., 972-329-8535