Town East Blvd (Military Pkwy to Skyline)

• Scope – This project will be a total reconstruction of Town East Blvd. from Military Parkway to Skyline Drive that will be a four–lane divided arterial with two vehicle lanes in each direction separated by a depressed/bioswale median with concrete curb and gutter.
 Current Status – Design is 99% complete. 

 Schedule – Project is on schedule to begin construction in the Fall of 2016.
Project Contact – Corey Nesbit, P.E., 972-329-8535