NEW BUILDER INSPECTION PHASE REQUIREMENTS
The following inspections are made by the Building Inspection Division of the City of Mesquite in order to provide for the health and safety of the citizens of Mesquite. The required areas of inspection are building, plumbing, mechanical, electrical and energy.
It is the responsibility of each person or firm to assure that an inspection request is made when each phase is ready for inspection. The job superintendent is responsible for requesting all inspections. All work must be inspected and approved before proceeding to the next phase.
IMPORTANT : Please have all work completed in each phase before requesting an inspection to assure optimum efficiency and promptness.
PHASE I
- Plumbing rough-in of all sanitary waste and water lines
- Sewer lateral connected to service tap
- Gas yard line installation and test
- Form board survey including driveway slope
PHASE II
- Foundation slab
- Electrical under slab
PHASE III
- Structural framing
- Electrical rough-in
- Plumbing top-out, 2 nd floor rough water test, gas test (inside where applicable) and shower pan water test
- Mechanical rough-in
Note: Must call all trades in for separate
inspections. Framing will not be made until Plumbing,
Mechanical and Electrical have passed. Plumbing,
Mechanical & Electrical
inspections may be called in at the same time.
PHASE IV
- (Third Party Energy Insulation Inspection)
PHASE V
- (Third Party Energy Final Inspection)
PHASE VI
- Building, electrical, plumbing and mechanical finals
Note: Must call all trades in for separate inspections.
Building final will not be made until all other trades
have passed inspections. Energy inspections are required
per Senate Bill 365. You, the builder of new homes,
are required to hire a third-party inspection company
to inspect each dwelling Phase IV and Phase V for energy
code compliance. Inspections must comply to the MECcheck
design submitted with your permit application. Phase
IV Energy Insulation Inspection, HVAC duct and the
building envelope are required before sheetrock is
added. A Phase IV Energy Final Inspection is required
at completion of your home. A copy of the approved
inspection must be in your permit pouch before final
inspection will be approved by the City of Mesquite.
INSPECTION REQUEST LINE
CALL BY 4:00 P.M. FOR NEXT BUSINESS DAY
(972) 329-8505 |